logo

Bhiwandi - Kalyan - Shil Phata SH - 40

Sector: Mass Transit • Location: India

Source: World Bank Group

Project
Active

In September 2006, the Ministry of Road Transport & Highways (MoRTH),Government of India signed a 15 year concession contract (including 18 month of construction period) to Malaysia’s Plus Expressway Berhad to widen and strengthen the 21.6 km section on State Highway 40(SH 40) and National Highway 222 (NH 222) between Bhiwandi, Kalyan and Shil Phata in the state of Maharashtra.

The project was

Project Information FAQ

Project Information

4 Q
The project “Bhiwandi - Kalyan - Shil Phata SH - 40” is an infrastructure initiative in the Mass Transit sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In September 2006, the Ministry of Road Transport & Highways (MoRTH),Government of India signed a 15 year concession contract (including 18 month of construction period) to Malaysia’s Plus Expressway Berhad to widen and strengthen the 21.6 km section on State Highway 40(SH 40) and National Highway 222 (NH 222) between Bhiwandi, Kalyan and Shil Phata in the state of Maharashtra. The project was divided in two phases where Phase I involved Strengthening and widening the existing 2-lane carriageway to a 4-lane divided carriageway, whereas the second phase involved constructing Kalyan Bypass (with major bridge on Ulhas river and River Over Bridge (ROB) on the Central Railway Line along with the approach roads) and flyover bridge of Bhiwandi Bypass Junction. Work on both the phases was expected to start parallely. Plus Expressway Berhad established a special purpose vehicle, Plus BKSP Toll Limited, to implement the project. PEB won the tender through competitive bidding, conducted by MoRTH. While the bidding details were not known at the time of collection of information, it is known that the SPV was to recover the capital costs and operating costs including returns through tolls during the concession period (excluding construction period). The concession agreement for the project was signed in September 2006. The total Project cost is estimated to be INR 187 crores (approximately US$41.3 million) over a concession period of approximately 6 years and 8 months. Financing comprises an INR $815m (US$18 million) term loan solely provided by Canara Bank and equity. Construction on the project began in September 2006 and was expected to be completed by March 2008.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data