Bhiwandi Wada BOT Project
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
Bhiwandi Wada BOT Project consisted of Improvement, Strengthening and Black Topping of Bhiwandi Wada Road (S.H. 35) Km 0/645 to 18/000 in Taluka Bhiwandi with Private financing and toll rights on Build, Operate and Transfer (B.O.T.) basis. The total length was 18 km. The project was awarded by Public Works Department on behalf of Government of Maharashtra to IRB Infrastructure under a 10 year and
- Status
- Closed
- Sector
- Road, Commercial, Government
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Bhiwandi Wada BOT Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Concluded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Bhiwandi Wada BOT Project consisted of Improvement, Strengthening and Black Topping of Bhiwandi Wada Road (S.H. 35) Km 0/645 to 18/000 in Taluka Bhiwandi with Private financing and toll rights on Build, Operate and Transfer (B.O.T.) basis. The total length was 18 km. The project was awarded by Public Works Department on behalf of Government of Maharashtra to IRB Infrastructure under a 10 year and eight moth concession contract including 12 months of construction period. The concession contract was signed in January 1998 and the starting period (construction) was also January 1998. The construction phase was completed in February 1999. The concession period ends in September 2008. The project cost was estimated to be INR 94.5 Millions (US$2.3 million). The project reached financial closure in January 1998 with a loan from IDBI Bank Ltd and Dombivli Nagari Sahakari Bank Ltd. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Government |
Article published date | 2024-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
