Bhusawal-Jalgaon - 3rd Line Railway Project
Closed · Maharashtra
Source: India Investment Grid (IIG)
Information Central Railway [CR] - I has come up with Bhusawal-Jalgaon - 3rd Line Railway Project with a ticket size of 333 INR Crores. This project in Railway Track sub-sector involves The current status of the project is Not Applicable Economic/Social Impact of the Project Jalgaon-Bhusawal Section is an over-saturated section of Central Railway. This section deals with the traffic from four d
- Status
- Closed
- Sector
- Mass Transit, Rail, Government
- Location
- Jalgaon, Maharashtra, India
- Updated
- 22 Jul 2026
- Source
- India Investment Grid (IIG)
ConstructChat
Ask ConstructChat about Bhusawal-Jalgaon - 3rd Line Railway Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Information Central Railway [CR] - I has come up with Bhusawal-Jalgaon - 3rd Line Railway Project with a ticket size of 333 INR Crores. This project in Railway Track sub-sector involves The current status of the project is Not Applicable Economic/Social Impact of the Project Jalgaon-Bhusawal Section is an over-saturated section of Central Railway. This section deals with the traffic from four directions viz. Mumbai, Surat, Nagpur and Khandwa. At present, the major operational constraint is Jalgaon Junction, which is dealing with traffic from Mumbai and Surat directions. Traffic moving towards Surat coming from Bhusawal from UP side has to cross DN main line at Jalgaon Yard and similarly traffic coming from Surat is required to be dealt with traffic coming from Mumbai, Pune, Solapur and Aurangabad. Considering the present volume of traffic and also the expected growth of traffic in view of proposed doubling of Surat-Jalgaon line, faster movement of traffic is essential in Jalgaon-Bhusawal section. It is also necessary to segregate the traffic in Jalgaon-Bhusawal section, in order to avoid unwarranted detention of traffic in surface Crossing at Jalgaon Yard. |
Original sector | Railways |
Procurement method | |
Budget |
Location
Country | India |
State | Maharashtra |
City | Jalgaon |
Source
Source | India Investment Grid (IIG) |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Rail, Government |
Article published date | 2024-02-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
