BHWSD Canyon View Drive Sewer Replacement
Sector: Power Transmission • Location: Longview, Washington, United States of America
Source: Dodge USA
Providing all materials and labor to construct approximately 4,500 linear feet of 6-inch and 8 inch cured in place sewer pipe lining (CIPP), 1,150 linear feet of 6-inch, 8-inch, and 10-inch HDPE sewer pipe installed by open cut methods, and 1,410 linear feet of 10-inch HDPE sewer pipeline utilizing horizontal directional drilling, 7 new manholes, and a total of 34 manholes will be coated. Addition
- Status
- Closed
- Sector
- Power Transmission, Water Supply and Storage, Waste Processing and Treatment, Road, Government, Commercial, Power Generation (CCGT)
- Location
- Longview, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about BHWSD Canyon View Drive Sewer Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Providing all materials and labor to construct approximately 4,500 linear feet of 6-inch and 8 inch cured in place sewer pipe lining (CIPP), 1,150 linear feet of 6-inch, 8-inch, and 10-inch HDPE sewer pipe installed by open cut methods, and 1,410 linear feet of 10-inch HDPE sewer pipeline utilizing horizontal directional drilling, 7 new manholes, and a total of 34 manholes will be coated. Additionally, miscellaneous landscaping and pavement restoration will be required. Temporary access roads... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Longview |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Water Supply and Storage, Waste Processing and Treatment, Road, Government, Commercial, Power Generation (CCGT) |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
