Bicentenario Wind Project

Sector: Raw Materials • Location: Argentina

Source: Inter-American Development Bank (IADB)

Project
In Implementation

The objective of the Project is the financing of the construction, operation and maintenance a wind farm of approximately 100 MW and its associated facilities. The Project connects to the 132 kV electric power transmission line “Petroquímica-Puerto Deseado” which runs right next to the Project. As part of the interconnection works, the 500 kV Santa Cruz Norte substation will be boosted with a new

Project Information FAQ

Project Information

4 Q
The project “Bicentenario Wind Project” is an infrastructure initiative in the Raw Materials sector, located in Argentina. Taiyo aggregates data on it from Inter-American Development Bank (IADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in implementation

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objective of the Project is the financing of the construction, operation and maintenance a wind farm of approximately 100 MW and its associated facilities. The Project connects to the 132 kV electric power transmission line “Petroquímica-Puerto Deseado” which runs right next to the Project. As part of the interconnection works, the 500 kV Santa Cruz Norte substation will be boosted with a new 150 MVA 500 kV/132 kV transformer. The total project cost is approximately US$ 150-155 million (including VAT & interest during construction) and will be financed on a corporate basis. The financial plan for the project will include an A loan of up to US$ 60 million with a 10 year tenor, and a Co-loan from an ECA for the rest of the financing. The loan will also include a grace period of six (6) months after the commercial operation date of the Project. The project will contribute to the development of renewable energy in Argentina by contributing to the diversification of its energy matrix. The first phase of the project will add at least 100 MW of renewable capacity to the national grid thus decreasing fossil fuel generation reliance; and by displacing approximately 213,733 equivalent tons of carbon dioxide emissions per year.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data