BICY Headquarters Complex Fire Station
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The Fire Station Operations Center project will construct a facility to house activities for the NPS fire program. This includes a 5,142 sf single story pre-engineered metal building that contains offices, kitchen/break area, physical fitness gym, storage cache, bathrooms, conference room, mechanical/electrical/IT room, and other administrative spaces. HVAC, plumbing, and electrical systems are in
- Status
- Under Construction
- Sector
- Metal, Commercial, Car parking, Power Generation (CCGT), Residential, Road, Water Supply and Storage, Automotive
- Location
- Ochopee, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about BICY Headquarters Complex Fire Station
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Fire Station Operations Center project will construct a facility to house activities for the NPS fire program. This includes a 5,142 sf single story pre-engineered metal building that contains offices, kitchen/break area, physical fitness gym, storage cache, bathrooms, conference room, mechanical/electrical/IT room, and other administrative spaces. HVAC, plumbing, and electrical systems are included. Exterior includes an ADA entry ramp and sidewalk, parking lot, driveway, stormwater manag... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Ochopee |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Commercial, Car parking, Power Generation (CCGT), Residential, Road, Water Supply and Storage, Automotive |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
