logo
ProjectClosed

Bid-Low Water Crossing Construction

Sector: Water Supply and Storage • Location: Cameron, Texas, United States of America

Source: Dodge USA

4000 psi concrete 24ft wide 75 foot long 5 different location 45 different roadways /a broom finish in every 20foot construction joint and 6-inch concrete

Status
Closed
Sector
Water Supply and Storage, Commercial, Government, Cement, Waste Processing and Treatment
Location
Cameron, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Bid-Low Water Crossing Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bid-Low Water Crossing Construction” is an infrastructure initiative in the Water Supply and Storage sector, located in Cameron, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

4000 psi concrete 24ft wide 75 foot long 5 different location 45 different roadways /a broom finish in every 20foot construction joint and 6-inch concrete

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Cameron

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Government, Cement, Waste Processing and Treatment

Article published date

2024-12-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project