Bifrost Subsea Cable Capacity Upgrade
Sector: Power Generation (CCGT)
Source: SubTel Forum
Ciena and Lightstorm have enhanced the Bifrost subsea cable system using Ciena's WaveLogic 6 Extreme coherent optics technology. This upgrade achieved a world record of 800 Gbps on a single wavelength across the 16,608 km trans-Pacific Bifrost Cable System, significantly increasing capacity to support AI and cloud traffic. The project delivered 18 Tbps of total fibre pair capacity with improved po
- Status
- Closed
- Sector
- Power Generation (CCGT), Road
- Updated
- 22 Jul 2026
- Source
- SubTel Forum
ConstructChat
Ask ConstructChat about Bifrost Subsea Cable Capacity Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Ciena and Lightstorm have enhanced the Bifrost subsea cable system using Ciena's WaveLogic 6 Extreme coherent optics technology. This upgrade achieved a world record of 800 Gbps on a single wavelength across the 16,608 km trans-Pacific Bifrost Cable System, significantly increasing capacity to support AI and cloud traffic. The project delivered 18 Tbps of total fibre pair capacity with improved power efficiency and reduced equipment footprint. |
Original sector | Telecommunications |
Location
| Not available for this record. |
Source
Source | SubTel Forum |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Road |
Article published date | 2026-04-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- A Bridge Home Projects
- Site C Worker Accommodation
- Canadian Tire Corporate Office Interior Renovation
