Big Bend Lower Brule Bank Stabilization
One of 10,000+ projects Taiyo tracks in South Dakota.
Source: Dodge USA
Project Description: The project is an approximate 0.5 mile reach located along the left descending bank of Lake Sharpe upstream of the Lower Brule, SD town site. Lower Brule North Element 1 Phase 1 includes riprap shoreline protection, an offshore breakwater constructed primarily of placing spalls and riprap and earth fill within the lake, earthwork to excavate and grade riparian planting benches
- Status
- Under Construction
- Sector
- Water Supply and Storage, Commercial, Waste Processing and Treatment
- Location
- Lower Brule, South Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Big Bend Lower Brule Bank Stabilization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding, Construction Documents |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project Description: The project is an approximate 0.5 mile reach located along the left descending bank of Lake Sharpe upstream of the Lower Brule, SD town site. Lower Brule North Element 1 Phase 1 includes riprap shoreline protection, an offshore breakwater constructed primarily of placing spalls and riprap and earth fill within the lake, earthwork to excavate and grade riparian planting benches, an aggregate maintenance trail including installation of 14 culverts. Related tasks include ear... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Dakota |
City | Lower Brule |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Waste Processing and Treatment |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
