logo

Big Hollow Creek Channel Stabilization

Sector: Commercial • Location: Peoria, Illinois, United States of America

Source: Dodge USA

Project
Pre-Design

Stabilize the channel to control erosion under Big Hollow bridge. Repairs will be made to the bridge deck of SN 072-6007 in 2024 under separate contract

Status
Prospective
Sector
Commercial, Water Supply and Storage, Bridge, Waste Processing and Treatment, Road, Government
Location
Peoria, Illinois, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Big Hollow Creek Channel Stabilization

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Big Hollow Creek Channel Stabilization” is an infrastructure initiative in the Commercial sector, located in Peoria, Illinois, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Stabilize the channel to control erosion under Big Hollow bridge. Repairs will be made to the bridge deck of SN 072-6007 in 2024 under separate contract

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Peoria

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Bridge, Waste Processing and Treatment, Road, Government

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project