Big Quilcene River Bridge Replacement
Sector: Government • Location: Brinnon, Washington, United States of America
Source: Dodge USA
Big Quilcene River Bridge Replacement Project; Floodplain Phase The Floodplain Phase of the Lower Big Quilcene Bridge Replacement Project includes; 1 realignment of 4,591 feet of the Lower Big Quilcene River back into its historic channel location, 2 the construction of 2,262 feet of new river side channels, 3 the regrading and restora-tion of 800 feet. of the existing Big Quilcene River channel,
- Status
- Closed
- Sector
- Government, Bridge, Commercial, Road
- Location
- Brinnon, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Big Quilcene River Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Big Quilcene River Bridge Replacement Project; Floodplain Phase The Floodplain Phase of the Lower Big Quilcene Bridge Replacement Project includes; 1 realignment of 4,591 feet of the Lower Big Quilcene River back into its historic channel location, 2 the construction of 2,262 feet of new river side channels, 3 the regrading and restora-tion of 800 feet. of the existing Big Quilcene River channel, 4 the construction of 684 feet of a new south setback levee, 5 the removal of 765 feet of the exi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Brinnon |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Bridge, Commercial, Road |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- CR 210/GLYEN HICKMAN RD FROM SR 117 TO CR 356/AIRPORT RD-TIA
- COLUMBUS VIADUCT RAILROAD BRIDGES.
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SIGNAL COMMUNICATIONS; SERVICE & SUPPORT - FY 2018
