Big Shift Heating Infrastructure Replacement
Sector: Commercial • Location: Davis, California, United States
Source: Engineering News-Record (ENR)
A $180-million project replacing an old gas-powered heating system with a more sustainable one at UC Davis, completed in two phases.
- Status
- Under Construction
- Sector
- Commercial
- Location
- Davis, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Engineering News-Record (ENR)
ConstructChat
Ask ConstructChat about Big Shift Heating Infrastructure Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | ongoing |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A $180-million project replacing an old gas-powered heating system with a more sustainable one at UC Davis, completed in two phases. |
Original sector | Utilities |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Davis |
Source
Source | Engineering News-Record (ENR) |
URL |
More Details
Record type | Project |
Sector | Commercial |
Article published date | 2026-04-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States
- Engineering, Procurement, and Construction of Third Bosphorus Bridge
- Tampa Bay Seawater Desalination Plant
- Portugues Dam, Ponce
- Sinking Creek Wastewater Treatment Plant Expansion, Tennessee
- Carlsbad Desalination Project, San Diego, California
- Joint Base Lewis-McChord
- Fort Riley Army Base, Kansas
- Fort Benning, Georgia
