Big Sky Carbon Hub Processing Facility
The owner, status and timeline of this project. A free account opens every field.
Source: Insider Monkey
Construction of a processing facility at the Big Sky Carbon Hub in Montana designed for approximately 8 MMcf/d of inlet capacity, targeting production of around 12 MMcf of helium and 125,000 metric tons of refined CO₂ annually at initial operations. The project includes gathering pipeline installation and aims to initiate helium sales and carbon management operations by early 2027.
- Status
- Under Construction
- Sector
- Manufacturing (Industrial)
- Location
- Montana, United States of America
- Updated
- 22 Jul 2026
- Source
- Insider Monkey
ConstructChat
Ask ConstructChat about Big Sky Carbon Hub Processing Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a processing facility at the Big Sky Carbon Hub in Montana designed for approximately 8 MMcf/d of inlet capacity, targeting production of around 12 MMcf of helium and 125,000 metric tons of refined CO₂ annually at initial operations. The project includes gathering pipeline installation and aims to initiate helium sales and carbon management operations by early 2027. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Montana |
Source
Source | Insider Monkey |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial) |
Article published date | 2026-04-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
