Big Spring WWTP Grit Removal System
Sector: Water Supply and Storage • Location: Big Spring, Texas, United States of America
Source: Dodge
A. The Project generally includes the removal and cleaning of the existing Headcell unit and associated grit chamber, in addition to the replacement of existing valves, piping, and mechanical grit washing and dewatering equipment. B. Removed grit is to be placed in the Owner s containers by the Contractor, for disposal by the Owner. Contractor shall provide and utilize drainage boxes or other mech
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Waste Processing and Treatment, Power Transmission, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Big Spring, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Big Spring WWTP Grit Removal System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A. The Project generally includes the removal and cleaning of the existing Headcell unit and associated grit chamber, in addition to the replacement of existing valves, piping, and mechanical grit washing and dewatering equipment. B. Removed grit is to be placed in the Owner s containers by the Contractor, for disposal by the Owner. Contractor shall provide and utilize drainage boxes or other mechanical dewatering equipment to dewater the grit prior to placing grit in Owner s containers. Grit... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Big Spring |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Waste Processing and Treatment, Power Transmission, Commercial, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
