Big Spring WWTP Grit Removal System
Sector: Waste Processing and Treatment • Location: Big Spring, Texas, United States of America
Source: Dodge
A. The Project generally includes the removal and cleaning of the existing Headcell unit and associated grit chamber, in addition to the replacement of existing valves, piping, and mechanical grit washing and dewatering equipment. B. Removed grit is to be placed in the Owner s containers by the Contractor, for disposal by the Owner. Contractor shall provide and utilize drainage boxes or other mech
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Commercial, Government, Manufacturing (Industrial)
- Location
- Big Spring, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Big Spring WWTP Grit Removal System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | gc bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A. The Project generally includes the removal and cleaning of the existing Headcell unit and associated grit chamber, in addition to the replacement of existing valves, piping, and mechanical grit washing and dewatering equipment. B. Removed grit is to be placed in the Owner s containers by the Contractor, for disposal by the Owner. Contractor shall provide and utilize drainage boxes or other mechanical dewatering equipment to dewater the grit prior to placing grit in Owner s containers. Grit... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Big Spring |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Commercial, Government, Manufacturing (Industrial) |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
