logo

Big Sur Capital Preventive Maintenance (CAPM) Project

Sector: Government • Location: Monterey, California, United States of America (USA)

Source: California Department of Transportation (Caltrans)

Project
Not Started

The California Department of Transportation (Caltrans), has prepared this Initial Study with Mitigated Negative Declaration, which examines the potential environmental impacts of the Big Sur CAPM project on approximately a 35-mile section of State Route 1, located in Monterey County California. The Draft Initial Study was circulated for public review and comment from January 26, 2018 to February 2

Project Information FAQ

Project Information

5 Q
The project “Big Sur Capital Preventive Maintenance (CAPM) Project” is an infrastructure initiative in the Government sector, located in Monterey, California, United States of America (USA). Taiyo aggregates data on it from California Department of Transportation (Caltrans).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

not started

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The California Department of Transportation (Caltrans), has prepared this Initial Study with Mitigated Negative Declaration, which examines the potential environmental impacts of the Big Sur CAPM project on approximately a 35-mile section of State Route 1, located in Monterey County California. The Draft Initial Study was circulated for public review and comment from January 26, 2018 to February 26, 2018. A Notice of Intent to Adopt a Mitigated Negative Declaration, and Opportunity for Public Hearing was published in the Monterey County Herald on Friday January 26, 2018. The Notice of Intent and Opportunity for Public Hearing was mailed to a list of stakeholders that included both government agencies and private citizen groups who occupy and have interest in the project area. No comments were received during the public circulation period. The project has completed the environmental compliance with circulation of this document. When funding is approved, Caltrans can design and build all or part of the project Throughout this document, a vertical line in the margin indicates a change that has been made since the draft document circulation. Minor editorial changes and clarifications have not been indicated.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data