Big Water Solar Energy Center 74.5 MW
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Substation: 1. Construct a new 230 kV substation (Minnows) on the project site. 2. Add one 230 kV line switch at Sweatt for string bus to Minnows substation approximately 1.0 miles. 3. Add one 230kV breaker at Sweatt substation. 4. Add one 230/34.5 kV main step-up transformer (85 MVA) with a 230 kV breaker to connect PV inverter array. 5. Construct 34.5 kV bus to connect the PV array to Minnows 23
- Status
- Under Construction
- Sector
- Water Supply and Storage, Power Generation (CCGT), Solar, Commercial
- Location
- Okeechobee, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Big Water Solar Energy Center 74.5 MW
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Substation: 1. Construct a new 230 kV substation (Minnows) on the project site. 2. Add one 230 kV line switch at Sweatt for string bus to Minnows substation approximately 1.0 miles. 3. Add one 230kV breaker at Sweatt substation. 4. Add one 230/34.5 kV main step-up transformer (85 MVA) with a 230 kV breaker to connect PV inverter array. 5. Construct 34.5 kV bus to connect the PV array to Minnows 230 kV substation. 6. Add relays and other protective equipment. 7. Breaker replacements: None II. ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Okeechobee |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Solar, Commercial |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation