logo
ProjectClosed

Bihar Kosi Basin Development Project

Closed · India

Source: World Bank Group

The development objective of the Bihar Kosi Basin Development Project for India is to enhance resilience to floods and increase agricultural production and productivity in the targeted districts in the Kosi river basin, and to enhance Bihar’s capacity to respond promptly and effectively to an eligible crisis or emergency. The project comprises of five components. The first component, improving flo

Status
Closed
Sector
Road, Water Supply and Storage, Waste Processing and Treatment, Raw Materials, Government
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Bihar Kosi Basin Development Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Bihar Kosi Basin Development Project” is an infrastructure initiative in the Road sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The development objective of the Bihar Kosi Basin Development Project for India is to enhance resilience to floods and increase agricultural production and productivity in the targeted districts in the Kosi river basin, and to enhance Bihar’s capacity to respond promptly and effectively to an eligible crisis or emergency. The project comprises of five components. The first component, improving flood risk management objective is to increase the capacity of the water resources department (WRD) to manage flood risk and to decrease vulnerability to floods in the Kosi river basin. It consists of following two sub-components: (i) reinforcement of flood control infrastructure; and (ii) support to strengthen institutional capacity to manage flood risk. The second component, enhancing agricultural productivity and competitiveness will work with organized farmers to increase agricultural production (which includes crops, horticulture, livestock, and fisheries) and productivity by expanding their access to and adoption of innovative and climate-resilient farm technologies and practices (including irrigation) and extending their linkages to market infrastructure. It consists of following three sub-components: (i) intensification and diversification of agricultural production systems; (ii) strengthening of agricultural value chains; and (iii) institutional development for market-led extension. The third component, augmenting connectivity objective is to improve farmers’ access to markets through the expansion of the local road network that connects rural roads to the main road network that improves connectivity of habitations to the market centers. It consists of following three sub-components: (i) construction of roads; (ii) institutional strengthening activities at rural works department; and (iii) construction of bridges. The fourth component, contingent emergency response will draw resources from the unallocated expenditure category and or allow the Government of Bihar (GoB) to request the Bank to re-categorize and reallocate financing from other project components to partially cover emergency response and recovery costs. The fifth component, implementation support will finance activities required for project implementation that will include incremental operating costs of Bihar aapada punarwas evam punarnirman society (BAPEPS) and the implementing agencies (IAs).

Original sector

FY17 - Agriculture, Fishing and Forestry,FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Waste Processing and Treatment, Raw Materials, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project