BIHAR TUBEWELLS
One of 10,000+ projects Taiyo tracks in India.
Source: World Bank Group
By (i) introducing improved tubewell technology; (ii) undertaking a phased program to rehabilitate and modernize most of Bihar's existing public tubewells (PTWs); and (iii) strengthening the institution responsible for PTW activities, Bihar's considerable groundwater potential will be expanded resulting in an increase in agricultural production. The tubewell irrigation systems to be rehabilitated
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Automotive, Waste Processing and Treatment, Power Generation (CCGT), Raw Materials, Government
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about BIHAR TUBEWELLS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | By (i) introducing improved tubewell technology; (ii) undertaking a phased program to rehabilitate and modernize most of Bihar's existing public tubewells (PTWs); and (iii) strengthening the institution responsible for PTW activities, Bihar's considerable groundwater potential will be expanded resulting in an increase in agricultural production. The tubewell irrigation systems to be rehabilitated or constructed under the project will be distributed in 26 of Northern Bihar's 38 administrative districts. The Bihar PublicTubewell Project will comprise a seven-year program and will support several components. They will comprise: (i) construction of about 500 new public tubewells; (ii) modernization of about 1000 existing tubewells; (iii) rehabilitation of about 3700 other existing tubewells; and (iv) construction of power lines to about 5200 tubewells so that sufficient power is available to achieve planned irrigation intensities. In addition, the project will include (v) improvements to management capability, through construction of buildings, provision of vehicles and equipment, training, monitoring and evaluation; and (vi) provision of technical services to undertake special studies including management, socio-economic performance and cost recovery. |
Original sector | Agriculture, Fishing and Forestry |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Automotive, Waste Processing and Treatment, Power Generation (CCGT), Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in India
- Kiru Hydroelectric Project Jammu and Kashmir India
- Pinnapuram Integrated Renewable Energy Project India
- Chuzachen Hydroelectric Power Project Sikkim
- Mahan I Power Project Madhya Pradesh
- Rampur Hydro Electric Power Project Himachal Pradesh
- UriII Hydroelectric Project Jammu and Kashmir
- Kakrapar Atomic Power Station Expansion
- Nathpa Jhakri India Hydroelectric Power Plant
