Bihar Water Security and Irrigation Modernization Project
Sector: Water Supply and Storage • Location: India
Source: World Bank Group
Bihar, despite its fertile lands in the Indo-Gangetic Plain, faces significant challenges in water management, with inconsistent monsoons, inadequate irrigation, frequent flooding, and drought severely limiting agricultural productivity and economic growth. This project aims to address these issues through two key interventions: improving irrigation systems and enhancing flood and erosion control.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Bihar, despite its fertile lands in the Indo-Gangetic Plain, faces significant challenges in water management, with inconsistent monsoons, inadequate irrigation, frequent flooding, and drought severely limiting agricultural productivity and economic growth. This project aims to address these issues through two key interventions: improving irrigation systems and enhancing flood and erosion control. Using Investment Project Financing (IPF) and Performance-Based Conditions (PBCs), the project seeks to transform Bihar’s water management sector and ensure long-term sustainability.The project comprises four components, addressing both environmental and social concerns. Component 1 focuses on restoring and modernizing irrigation infrastructure without disturbing the river’s main stem or the flow in the river. This will optimize water availability, reduce losses, and promote efficient water use, supporting climate-resilient agriculture. Component 2 tackles flood risk reduction by strengthening existing embankments. The project will not finance the construction of new embankments, instead observed damages in stretches of embankments and riverbanks that are affecting the protection of canal infrastructure, and the command irrigation area will be strengthened. This approach minimizes environmental disruption while protecting communities and irrigation infrastructure from future flood and drought risks. The project will also explore green infrastructure such as nature-based solutions.Component 3 strengthens water governance and institutional frameworks by implementing operational procedures, testing new irrigation service models, and expanding early warning systems for floods and droughts. Component 4 ensures effective project execution through monitoring and evaluation, integrating climate co-benefits, gender inclusivity, and citizen engagement. The project aligns with World Bank policies, addressing potential social impacts, such as the presence of squatters, while promoting equitable and sustainable outcomes. Together, these interventions aim to modernize Bihar’s water management, enhancing agricultural productivity and community resilience. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
