logo

Bilijk - Stormwater Enhancements for Community Pow Wow Grounds

Sector: Road • Location: New Brunswick, Canada

Source: Infrastructure Canada

Project
Completed

This project consist of rehabilitating a deteriorating culvert crossing and upgrading the access road to Bilijk First Nation Pow Wow grounds. The culvert is in need of repair due to age and is sensitive to high river levels. It is recommended for upgrades based on a 2021 Community Drainage Assessment. The project scope includes using a trenchless method to slip line the existing culvert with a sm

Status
Closed
Sector
Road
Location
New Brunswick, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Bilijk - Stormwater Enhancements for Community Pow Wow Grounds

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Bilijk - Stormwater Enhancements for Community Pow Wow Grounds” is an infrastructure initiative in the Road sector, located in New Brunswick, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project consist of rehabilitating a deteriorating culvert crossing and upgrading the access road to Bilijk First Nation Pow Wow grounds. The culvert is in need of repair due to age and is sensitive to high river levels. It is recommended for upgrades based on a 2021 Community Drainage Assessment. The project scope includes using a trenchless method to slip line the existing culvert with a smaller diameter HDPE pipe. Although the barrel capacity is expected to be reduced slightly, the culvert crossing operates under inlet control during intense rainfall events. A beveled pipe inlet will also improve culvert performance slightly under extreme rainfall and average river level conditions. The project will also upgrade and widen the road to decrease risk of washout and ensure safer access to the community’s Pow Wow grounds and well house. Additionally, the culvert is supporting a critical pipeline to the fish hatchery. Culvert upgrades will include features that support fish passage in the Indian Brook and Murray Brook watercourses, and will decrease the risk of flooding upstream. Failure of the road or culvert could be catastrophic to certain fish species supported at the hatchery. Risk mitigations have been considered to help ensure hatchery operations are unaffected. This project will increase the structural capacity to adapt to climate change impacts and extreme weather.

Original sector

Climate Resilience

Location

Country

Canada

State

New Brunswick

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Road

Article published date

2026-06-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project