Bindu Vayu Urja (Chakala) Private Limited
Sector: Wind • Location: India
Source: World Bank Group
Mytrah Energy Limited entered into an agreement with Maharashtra Government, to develop 39MW wind power project at Chakala village in the state of Maharashtra. Mytrah established Bindu Vayu Urja Private Limited, a special purpose vehicle, to execute this project. The wind farm would involve the building of 26 wind turbines of Suzlon S82 model of 1.5MW capacity each.The electricity generated from t
- Status
- Prospective
- Sector
- Wind, Raw Materials, Power Generation (CCGT), Government, Power Transmission, Automotive, Commercial
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Bindu Vayu Urja (Chakala) Private Limited
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Mytrah Energy Limited entered into an agreement with Maharashtra Government, to develop 39MW wind power project at Chakala village in the state of Maharashtra. Mytrah established Bindu Vayu Urja Private Limited, a special purpose vehicle, to execute this project. The wind farm would involve the building of 26 wind turbines of Suzlon S82 model of 1.5MW capacity each.The electricity generated from the project would be evacuated by NEWNE grid of India. The EPC for the power plant had been awarded to Suzlon Energy Limited. Suzlon would develop, construct, commission, operate and maintain the project at an all-inclusive price. Bindu Vayu Urja Private Limited had already approached Maharashtra State Electricity Distribution Company Limited (Maharashtra Discom )- for entering into Power Purchase Agreement. The APPC (Average Power Purchase Cost) base tariff as per MERC tariff order (dated 29 April 2011 for Wind zone 1) was US$ 0.10/Unit (INR 5.37 per unit @53.44 INR/USD) for the first 13 years of operation. The transmission charges would be paid by GFL to the state transmission utility. The total capacity of 39MW was eligible for CDM benefits and the company had initiated the process with UNFCC. Details of financial closure were not available.The total project cost estimated based on UNFCC Project Design Document (Suzon quototations) was US$ 32.9mn (INR 1757mn @53.44 INR/USD). As per company announcement to the market, the project was fully commissioned in the April 2012 to May 2012 period. Till further validated information, we are considering May 2012 as the financial closure date for the purpose of this database. |
Original sector | Energy |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Wind, Raw Materials, Power Generation (CCGT), Government, Power Transmission, Automotive, Commercial |
Article published date | 2024-09-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in India
- Mundra Power Plant Gujarat
- Vallur Conventional 1000MW Thermal Power Plant India
- Tapovan Vishnugad Hydroelectric Power Plant Uttarakhand
- Dabhol Power Plant Ratnagiri District Maharashtra India
- Tamil Nadu Wind Farm
- Tiroda Super Critical Thermal Power Plant Maharashtra
- Polavaram Hydro Electric Project Andhra Pradesh
- East Coast Energy Private Limited (ECEPL)
