logo

Binzhou Tiandiyuan Biomass Power Plant

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

Project
Active

The sponsor of the Binzhou biomass power plant was Shandong Tiandiyuan Industrial Co., Ltd. which had a 100% stake in the project. When the agreement was signed was unknown, but the loan agreement was signed with the Communications Bank in June 2012. The total investment was RMB 439 million (US$ 69.57 million). The total capacity of the plant was 2X24MW. The plant came into operation in Dec 2012.

Status
Prospective
Sector
Biomass, Manufacturing (Industrial), Power Generation (CCGT), Government, Commercial
Location
Shandong, China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Binzhou Tiandiyuan Biomass Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Binzhou Tiandiyuan Biomass Power Plant” is an infrastructure initiative in the Biomass sector, located in Shandong, China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The sponsor of the Binzhou biomass power plant was Shandong Tiandiyuan Industrial Co., Ltd. which had a 100% stake in the project. When the agreement was signed was unknown, but the loan agreement was signed with the Communications Bank in June 2012. The total investment was RMB 439 million (US$ 69.57 million). The total capacity of the plant was 2X24MW. The plant came into operation in Dec 2012. How the agreement was granted, through open bidding or direction negotiation was also not reported in the media.

Original sector

Energy

Budget

Location

Country

China

State

Shandong

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Biomass, Manufacturing (Industrial), Power Generation (CCGT), Government, Commercial

Article published date

2024-05-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project