BioDICE Feasibility Study

Sector: Biomass • Location: Australia

Source: Australian Renewable Energy Agency (ARENA)

Project
Closed

The project will investigate the feasibility of dispatchable, cost-effective power from forest and mill wastes using adapted diesel engines (direct injection carbon engine – bioDICE).Key resultsThe Feasibility Study has not identified any previously unknown technical or economic factors that could diminish the case for bioDICE – all results are positive.A simplified Life Cycle Analysis (LCA) shows

Project Information FAQ

Project Information

5 Q
The project “BioDICE Feasibility Study” is an infrastructure initiative in the Biomass sector, located in Australia. Taiyo aggregates data on it from Australian Renewable Energy Agency (ARENA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project will investigate the feasibility of dispatchable, cost-effective power from forest and mill wastes using adapted diesel engines (direct injection carbon engine – bioDICE).Key resultsThe Feasibility Study has not identified any previously unknown technical or economic factors that could diminish the case for bioDICE – all results are positive.A simplified Life Cycle Analysis (LCA) shows that each tonne of forest waste could generate 0.94 MWh of sent out electricity. In Victoria, this could displace 0.94 MWh of brown coal-based grid electricity, which would save 1,150-1,200 kg of CO2 of coal-fired power station emissions. After taking into account initial sequestration of CO2 for forest growth, an allowance for harvesting and transport, and emissions from leaving the waste in situ an overall benefit/reduction in CO2 of 1,150-1,230 kg CO2/tonne of forest waste utilised is achieved over the business-as-usual case. This is the best case for the 3.4 MW bioDICE plant analysed.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data