logo

Bioenergy Aratua & Miassaba Wind Farms

Sector: Biomass • Location: Brazil

Source: World Bank Group

Project
Active

The Brazilian company Bioenergy was granted authorizations to build six wind parks located in the state of Rio Grande do Norte (115.5 MW in total capacity). The 35-year contracts were signed with the regulatory agency ANEEL starting in June 2009. The following special purpose companies were creates to handle the parks: Aratua Central Geradora Eolica S.A., Brasventos Aratua 1 Geradora de Energia S.

Project Information FAQ

Project Information

5 Q
The project “Bioenergy Aratua & Miassaba Wind Farms” is an infrastructure initiative in the Biomass sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Brazilian company Bioenergy was granted authorizations to build six wind parks located in the state of Rio Grande do Norte (115.5 MW in total capacity). The 35-year contracts were signed with the regulatory agency ANEEL starting in June 2009. The following special purpose companies were creates to handle the parks: Aratua Central Geradora Eolica S.A., Brasventos Aratua 1 Geradora de Energia S.A and Miassaba Geradora Eolica S.A. The power plants were named EOL Aratua 1 (14.4 MW), EOL Aratua 2 (14.7 MW), EOL Aratua 3 (28.8 MW), Miassaba 2 (14.4 MW), Miassaba 3 (14.4 MW) and Miassaba 4 (28.8 MW). The total investment in the power plants Aratua 1 and Miassaba 3 were estimated at US$ 69.6 million (BRL 117 million) and was financed with a loan granted by the state-owned development bank BNDES approved in September 2011 (US$ 44.1 million or BRL 74.2 million) and with the emission of bonds by Bioenergy. As of August 2011, construction works only on these two plants were underway. In 2009, EOL Aratua 1 and EOL Miassaba 3 signed power purchase agreements arranged with the state-owned company Eletrobras for 20 years through the Brazilian Federal program PROINFA (incentive program for alternative power generating companies) or established through competitive bidding processes. Operations commenced in early 2012. http://www.bnamericas.com/news/electricpower/bioenergy-begins-operations-at-us695mn-wind-farms (for changed total project cost)

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data