logo

Bioenergy Aratua & Miassaba Wind Farms

One of 10,000+ projects Taiyo tracks in Brazil.

Source: World Bank Group

Project
Active

The Brazilian company Bioenergy was granted authorizations to build six wind parks located in the state of Rio Grande do Norte (115.5 MW in total capacity). The 35-year contracts were signed with the regulatory agency ANEEL starting in June 2009. The following special purpose companies were creates to handle the parks: Aratua Central Geradora Eolica S.A., Brasventos Aratua 1 Geradora de Energia S.

Status
Prospective
Sector
Cable car, Car parking, Biomass, Wind, Raw Materials, Telecommunications, Power Generation (CCGT), Government, Automotive, Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Bioenergy Aratua & Miassaba Wind Farms

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Bioenergy Aratua & Miassaba Wind Farms” is an infrastructure initiative in the Cable car sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Brazilian company Bioenergy was granted authorizations to build six wind parks located in the state of Rio Grande do Norte (115.5 MW in total capacity). The 35-year contracts were signed with the regulatory agency ANEEL starting in June 2009. The following special purpose companies were creates to handle the parks: Aratua Central Geradora Eolica S.A., Brasventos Aratua 1 Geradora de Energia S.A and Miassaba Geradora Eolica S.A. The power plants were named EOL Aratua 1 (14.4 MW), EOL Aratua 2 (14.7 MW), EOL Aratua 3 (28.8 MW), Miassaba 2 (14.4 MW), Miassaba 3 (14.4 MW) and Miassaba 4 (28.8 MW). The total investment in the power plants Aratua 1 and Miassaba 3 were estimated at US$ 69.6 million (BRL 117 million) and was financed with a loan granted by the state-owned development bank BNDES approved in September 2011 (US$ 44.1 million or BRL 74.2 million) and with the emission of bonds by Bioenergy. As of August 2011, construction works only on these two plants were underway. In 2009, EOL Aratua 1 and EOL Miassaba 3 signed power purchase agreements arranged with the state-owned company Eletrobras for 20 years through the Brazilian Federal program PROINFA (incentive program for alternative power generating companies) or established through competitive bidding processes. Operations commenced in early 2012. http://www.bnamericas.com/news/electricpower/bioenergy-begins-operations-at-us695mn-wind-farms (for changed total project cost)

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Cable car, Car parking, Biomass, Wind, Raw Materials, Telecommunications, Power Generation (CCGT), Government, Automotive, Commercial

Article published date

2024-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project