Biomass Research and Development Initiative (BRDI)
Sector: Biomass • Location: United States of America
Source: Grants.gov
The purposes of this modification are to:
- Modify Section II.C. Maximum and Minimum Award Size:
Accordingly, the following sentences are deleted: ?The proposed total project costs must fall between the ceiling and floor stated below. Applications and pre-applications that include proposed total project costs outside the stated ceiling and floor will not be reviewed or considered for award.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | archived |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The purposes of this modification are to: 1. Modify Section II.C. Maximum and Minimum Award Size: Accordingly, the following sentences are deleted: ?The proposed total project costs must fall between the ceiling and floor stated below. Applications and pre-applications that include proposed total project costs outside the stated ceiling and floor will not be reviewed or considered for award. ?Total project cost? means all the funds to complete the effort proposed by the Applicant, including DOE funds (including direct funding of any FFRDC) plus all other funds that will be committed by the Applicant as Cost Sharing.? and replaced with: ?The proposed Federal funding must fall between the ceiling and floor stated below. Applications and pre-applications that include proposed Federal funding outside the stated ceiling and floor will not be reviewed or considered for award. The ceiling and floor amounts are Federal funding amounts only.? 2. Modify Section IV.C.3.a ? Project Summary/Abstract File: Accordingly, the following paragraph is deleted: ?THIS DOCUMENT MUST NOT INCLUDE ANY PROPRIETARY OR SENSITIVE BUSINESS INFORMATION AS THE DOE AND/OR USDA-NIFA MAY MAKE IT AVAILABLE TO THE PUBLIC. The Pre-application project summary should not exceed 1 page when printed using standard 8.5? by 11? paper with 1? margins (top, bottom, left and right) with font not smaller than 10 point. Save the information in a single file named ?Summary.pdf,? and click on ?Add Optional Other Attachment? to attach.? and replaced with: ?THIS DOCUMENT MUST NOT INCLUDE ANY PROPRIETARY OR SENSITIVE BUSINESS INFORMATION AS THE DOE AND/OR USDA-NIFA MAY MAKE IT AVAILABLE TO THE PUBLIC. The Pre-application project summary should not exceed 1 page when printed using standard 8.5? by 11? paper with font not smaller than 10 point. Save the information in a single file named ?Summary.pdf,? and click on ?Add Optional Other Attachment? to attach.? All other terms and conditions of the Announcement remain the same. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
