logo

Biomedicum Research Laboratory, Karolinska Institute

Sector: Commercial • Location: Sweden

Source: Pharmaceutical Technology

Project
Closed

Biomedicum is one of the largest experimental biomedical research laboratories in Europe. Biomedicum research laboratory Solna Campus, Stockholm, Karolinska University Hospital June 2013 September 2018 C.F. Møller Architects Skanska, Nyréns Arkitektkontor Akademiska Hus and Karolinska Institute Biomedicum Research Laboratory is one of the largest experimental biomedical research laboratories in Eu

Project Information FAQ

Project Information

4 Q
The project “Biomedicum Research Laboratory, Karolinska Institute” is an infrastructure initiative in the Commercial sector, located in Sweden. Taiyo aggregates data on it from Pharmaceutical Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Biomedicum is one of the largest experimental biomedical research laboratories in Europe. Biomedicum research laboratory Solna Campus, Stockholm, Karolinska University Hospital June 2013 September 2018 C.F. Møller Architects Skanska, Nyréns Arkitektkontor Akademiska Hus and Karolinska Institute Biomedicum Research Laboratory is one of the largest experimental biomedical research laboratories in Europe. Located in the eastern part of the Solna Campus in Karolinska University Hospital, Sweden, the facility hosts medical research activities. It is expected to support Stockholm Life to be one of the world’s leading life science districts. Construction was initiated by Akademiska Hus in June 2013 in partnership with the Karolinska Institute. Akademiska Hus invested Skr320m ($37.64m) towards construction activities in June 2016. A topping out ceremony for the building was held in April 2016 and the facility was opened to the public in September 2018. An inauguration ceremony was held in November 2018. The Biomedicum research laboratory consists of sections A, B, C, and D, which are spread across 11 floors. The building covers a total floor space of 65,000m². Each storey of the building has a height of 3.9m, while the labs have a ceiling height of 2.7m. The research facility is directly connected to BioClinicum, a clinical research facility of Karolinska University Hospital. An atrium located on the third floor entrance includes common spaces such as a reception, a café, dining areas and conference rooms. The laboratory accommodates up to 1,600 researchers. It includes 26 laboratory spaces ranging between 800m² and 1,000m² in size. The facility’s open lab design encourages group-based work. The labs enhance collaboration among researchers to share equipment, bench space and support functions. It also features closed labs and specialised equipment. The laboratory spaces have a 2mm-thick plain rubber flooring. The laboratory’s design is in compliance with biosafety level two. It includes a cell culture room that is fitted with two biological safety cabinets. Sinks and handwashing unitsare located in the anteroom, while compressed air and CO2 gas are supplied to the labs. The building is used to carry out scientific activities of multiple disciplines and crossover research under one roof. It is occupied by five departments of the Karolinska Institute, including cell and molecular biology, medical biochemistry, biophysics, microbiology, tumour and cell biology, neuroscience, physiology and pharmacology. The laboratory reinforces clinical translation at national and international levels, acting as a reference centre for undergraduate, doctoral and post-doctoral studies. The facility further enhances the Karolinska Institutet as an international destination for health, medical education and science. The Biomedicum research laboratory was designed by CF Møller Architects, while Nyréns Arkitektkontor provided the interior design. Skanska was awarded the general construction contract worth Skr1.2bn ($189.2m) in October 2013. Akademiska Hus obtained the Miljöbyggnad Silver energy and environmental design certificate from the Sweden Green Building Council for the Biomedicum laboratory building. The office spaces are ventilated using a terminal in the ceiling, as well as cooling systems that are controlled automatically. A high-efficiency particulate air (HEPA) filter is also fitted. The workstations in the building are equipped with lighting detectors. Textile and metal solar blinds are fitted to automatically control and maintain the interior climate, increasing energy efficiency. In addition, the building features a green sedum roof for rainwater management. Get industry leading news, data and analysis delivered to your inbox Give your business an edge with our leading industry insights.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data