Biosolids Processing Plant Expansion
The owner, status and timeline of this project. A free account opens every field.
Source: Maine Public
Viridi Energy plans to expand a biosolids processing plant for sewage biosolids in Brunswick, Maine. The expansion aims to process up to 85,000 tons of sludge per year and produce renewable natural gas, while addressing local concerns about PFAS contamination from a previous spill.
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Natural Gas
- Location
- Brunswick, Maine, United States of America
- Updated
- 22 Jul 2026
- Source
- Maine Public
ConstructChat
Ask ConstructChat about Biosolids Processing Plant Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Proposed |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Viridi Energy plans to expand a biosolids processing plant for sewage biosolids in Brunswick, Maine. The expansion aims to process up to 85,000 tons of sludge per year and produce renewable natural gas, while addressing local concerns about PFAS contamination from a previous spill. |
Original sector | Waste Management |
Location
Country | United States of America (USA) |
State | Maine |
City | Brunswick |
Source
Source | Maine Public |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Natural Gas |
Article published date | 2025-02-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
