logo
ProjectPlanned

BirAllah LNG Project

Planned · Mauritania · Last reported Jan 2030

Source: Energy Capital & Power

The BirAllah project in Mauritania is estimated to hold 80 trillion cubic feet of reserves with potential to produce 10 million tons per annum of LNG annually by 2030.

Status
Prospective
Sector
LNG, Power Generation (CCGT), Oil and Gas
Location
Mauritania
Updated
22 Jul 2026
Source
Energy Capital & Power

ConstructChat

Ask ConstructChat about BirAllah LNG Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “BirAllah LNG Project” is an infrastructure initiative in the LNG sector, located in Mauritania. Taiyo aggregates data on it from Energy Capital & Power.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The BirAllah project in Mauritania is estimated to hold 80 trillion cubic feet of reserves with potential to produce 10 million tons per annum of LNG annually by 2030.

Original sector

Energy

Location

Country

Mauritania

Source

Source

Energy Capital & Power

URL

More Details

Record type

Project

Sector

LNG, Power Generation (CCGT), Oil and Gas

Article published date

2025-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project