Birch Coulee Solar 125MW
Sector: Power Generation (CCGT) • Location: Birch Cooley Township, Minnesota, United States of America
Source: Dodge USA
Birch Coulee Solar, LLC, an affiliate of AES Clean Energy, seeks a permit to construct and operate an up to 125-megawatt alternating current photovoltaic solar energy generating facility and associated infrastructure in Renville County, Minnesota. Birch Coulee Solar proposes to develop the project on approximately 768.2 acres within a site of 1,041.6 acres in Birch Cooley, Camp, and Bandon Townshi
- Status
- Prospective
- Sector
- Power Generation (CCGT), Solar, Commercial
- Location
- Birch Cooley Township, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Birch Coulee Solar 125MW
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Birch Coulee Solar, LLC, an affiliate of AES Clean Energy, seeks a permit to construct and operate an up to 125-megawatt alternating current photovoltaic solar energy generating facility and associated infrastructure in Renville County, Minnesota. Birch Coulee Solar proposes to develop the project on approximately 768.2 acres within a site of 1,041.6 acres in Birch Cooley, Camp, and Bandon Townships and the city of Franklin. As part of the project, Birch Coulee Solar proposes to construct a n... |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Birch Cooley Township |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar, Commercial |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
