Birdseye Battery Storage Project
Sector: Energy Storage • Location: Colorado, United States
Source: Mercomindia.com
The Birdseye battery storage project is a 199 MW/796 MWh utility-scale battery energy storage project located in Adams County, Colorado. It was acquired by GridStor from Accelergen and is expected to reach commercial operations by the end of 2028.
- Status
- Prospective
- Sector
- Energy Storage, Commercial, Power Transmission, Power Generation (CCGT)
- Location
- Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Mercomindia.com
ConstructChat
Ask ConstructChat about Birdseye Battery Storage Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Birdseye battery storage project is a 199 MW/796 MWh utility-scale battery energy storage project located in Adams County, Colorado. It was acquired by GridStor from Accelergen and is expected to reach commercial operations by the end of 2028. |
Original sector | Energy Storage |
Location
Country | United States of America (USA) |
State | Colorado |
Source
Source | Mercomindia.com |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Commercial, Power Transmission, Power Generation (CCGT) |
Article published date | 2026-05-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
