Birdseye BESS Project
Sector: Energy Storage • Location: Colorado, USA
Source: Energy-Storage.News
The Birdseye BESS project is a 199MW/796MWh battery energy storage system located in Adams County, Colorado. Acquired by GridStor from Accelergen, the project is planned to begin construction as early as 2027 with a commercial operations date at the end of 2028. The project is expected to create approximately 115 full-time jobs during construction.
- Status
- Closed
- Sector
- Energy Storage, Commercial
- Location
- Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Energy-Storage.News
ConstructChat
Ask ConstructChat about Birdseye BESS Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Birdseye BESS project is a 199MW/796MWh battery energy storage system located in Adams County, Colorado. Acquired by GridStor from Accelergen, the project is planned to begin construction as early as 2027 with a commercial operations date at the end of 2028. The project is expected to create approximately 115 full-time jobs during construction. |
Original sector | Energy Storage |
Location
Country | United States of America (USA) |
State | Colorado |
Source
Source | Energy-Storage.News |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Commercial |
Article published date | 2026-05-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in USA
- Zero-Emission Multiple Unit (ZEMU) Rail Vehicle
- Call back fire panel trouble battery charger issue
- Sweden's Eolus wraps up 100-MW California battery project sale
- Project True SStreet PMU Upgrade
- PG&E, Nissan, and Fermata Energy V2X Microgrid Demonstration
- Solar and Battery Systems for West Arlington Apartments
- Crimson Orchard Project
- Sunraycer Solar-Storage Projects
