BIS - Sewer Utility 92
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Work shall consist of approximately 230 LF of various sizes of storm sewer piping, one stormwater manhole structure, 530 LF of perforated pipe, 6,900 CY of unclassified excavation waste, placement of 275 Tons of rip rap, storm detention pond construction, embankment construction, and related items.
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT)
- Location
- Bismarck, North Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about BIS - Sewer Utility 92
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work shall consist of approximately 230 LF of various sizes of storm sewer piping, one stormwater manhole structure, 530 LF of perforated pipe, 6,900 CY of unclassified excavation waste, placement of 275 Tons of rip rap, storm detention pond construction, embankment construction, and related items. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Dakota |
City | Bismarck |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT) |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
