BIS - Sewer Utility 92
Sector: Water Supply and Storage • Location: Bismarck, North Dakota, United States of America
Source: Dodge USA
Work shall consist of approximately 230 LF of various sizes of storm sewer piping, one stormwater manhole structure, 530 LF of perforated pipe, 6,900 CY of unclassified excavation waste, placement of 275 Tons of rip rap, storm detention pond construction, embankment construction, and related items.
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT)
- Location
- Bismarck, North Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about BIS - Sewer Utility 92
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work shall consist of approximately 230 LF of various sizes of storm sewer piping, one stormwater manhole structure, 530 LF of perforated pipe, 6,900 CY of unclassified excavation waste, placement of 275 Tons of rip rap, storm detention pond construction, embankment construction, and related items. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Dakota |
City | Bismarck |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT) |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
