Bisan Maru Biofuel-Powered Tug
Sector: Seaport • Location: Okayama Prefecture, Japan
Source: Baird Maritime
Seagate Corporation, a subsidiary of Kawasaki Kisen Kaisha (K Line), launched a new biofuel-powered tug named Bisan Maru. The tug is being built by Kanagawa Dockyard and is scheduled to enter service at the Port of Mizushima in Okayama Prefecture, Japan, in August 2026. It features a conventional diesel engine with a biofuel blender and an ultrasonic hull anti-fouling system to reduce CO2 emission
- Status
- Under Construction
- Sector
- Seaport, Consumer Products
- Location
- Okayama Prefecture, Japan
- Updated
- 22 Jul 2026
- Source
- Baird Maritime
ConstructChat
Ask ConstructChat about Bisan Maru Biofuel-Powered Tug
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Seagate Corporation, a subsidiary of Kawasaki Kisen Kaisha (K Line), launched a new biofuel-powered tug named Bisan Maru. The tug is being built by Kanagawa Dockyard and is scheduled to enter service at the Port of Mizushima in Okayama Prefecture, Japan, in August 2026. It features a conventional diesel engine with a biofuel blender and an ultrasonic hull anti-fouling system to reduce CO2 emissions. |
Original sector | Marine |
Location
Country | Japan |
State | Okayama Prefecture |
Source
Source | Baird Maritime |
URL |
More Details
Record type | Project |
Sector | Seaport, Consumer Products |
Article published date | 2026-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Seaport projects in Japan
- Karita PFBC Power Plant
- Futtsu CombinedCycle Plant Yokohama
- Naoetsu LNG Receiving Terminal
- Akita Noshiro Offshore Wind Farm Project
- Muroran Port Sakimori District Road Improvement Project
- Otaru Port Main District Trunk Road Improvement Project
- Kagoshima Harbor Minato Ward (Minamibou) Intermodal Freight Terminal Maintenance Project
- Saganoseki Port Marine Products Handling Facilities Construction Project
