Bishkek Water Supply Project
Sector: Water Supply and Storage • Location: Kyrgyz Republic
Source: European Bank for Reconstruction and Development (EBRD)
The EBRD is considering lending up to EUR 5.4 million loan to the Bishkek Water Company to assist the company to replace water pipes and submersible pumps; drill new boreholes; install water meters; and, acquire equipment for pipe-laying, maintenance and repairs. The Bishkek Water Company, a municipal enterprise of the City of Bishkek. Up to EUR 5.4 million loan to the Bishkek Water Company with a
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The EBRD is considering lending up to EUR 5.4 million loan to the Bishkek Water Company to assist the company to replace water pipes and submersible pumps; drill new boreholes; install water meters; and, acquire equipment for pipe-laying, maintenance and repairs. The Bishkek Water Company, a municipal enterprise of the City of Bishkek. Up to EUR 5.4 million loan to the Bishkek Water Company with a sovereign guarantee of the Kyrgyz Republic. EUR 11.4 million. The project will improve water quality standards and energy efficiency in the water supply services provided by the Company. However, the funding under the current project will not allow the Client to achieve full compliance with EU water quality standards. Screening Category and Justification: Screened as B/1. Potential environmental impacts associated with the priority capital investments to improve the water quality, supply and energy efficiency of Bishkek water services were identified and quantified by means of an environmental analysis which was carried out together with environmental review/audit of existing facilities by an independent consultant. Due Diligence Undertaken, Outcomes and Residual Risks An environmental audit existing facilities and an environmental analysis of the proposed project has been carried out. Most impacts will be short-term negative impacts typical for any kind of civil construction and earthmoving works. These impacts could include minor traffic disturbances, pollution of air with dust and emissions from vehicles, soil run-off and sedimentation, noise, odour and light nuisance, additional waste generation. Other impacts on the environment, the human health and social conditions will work in the long-term prospect, during the operation and maintenance of the project affected facilities. These impacts can be mitigated or prevented by good construction practises which are identified in the ESAP. The project will improve water quality standards and energy efficiency in the water supply services provided by the Company. However, the funding under the current project will not allow the Client to achieve full compliance with EU water quality standards. Implementation Requirements As part of the due diligence, an Environmental and Social Action Plan (ESAP) has been prepared covering the required actions for issues related to the investment programme. The ESAP includes the organisational responsibilities for implementation of the ESAP and mitigation actions to be taken before and during construction, and operation. The ESAP has to be agreed with the Company prior to Board, and needs to be included in the legal agreements. Pre-signing Post-signing |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in Kyrgyz Republic
- City of Osh water utility joint venture
- IWS Smart Farm
- Advancing Green Investment and Resilient Economic Growth Program (Subprogram 1)
- Additional Financing for the Multisector Activities Support Facility 2025–2030
- Additional Financing for the Multisector Activities Support Facility 2025–2030
- Building Capacity for the Formation and Management of Water Users Associations
- Building Capacity for the Formation and Management of Water Users Associations
- Building Capacity for the Formation and Management of Water Users Associations
