logo
ProjectComplete

Bishkek Water Supply Project

One of 3,141 projects Taiyo tracks in Kyrgyz Republic.

Source: European Bank for Reconstruction and Development (EBRD)

The EBRD is considering lending up to EUR 5.4 million loan to the Bishkek Water Company to assist the company to replace water pipes and submersible pumps; drill new boreholes; install water meters; and, acquire equipment for pipe-laying, maintenance and repairs. The Bishkek Water Company, a municipal enterprise of the City of Bishkek. Up to EUR 5.4 million loan to the Bishkek Water Company with a

Status
Closed
Sector
Water Supply and Storage, Government, Residential, Automotive
Location
Kyrgyzstan
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Bishkek Water Supply Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bishkek Water Supply Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Kyrgyz Republic. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Sponsoring Agency

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The EBRD is considering lending up to EUR 5.4 million loan to the Bishkek Water Company to assist the company to replace water pipes and submersible pumps; drill new boreholes; install water meters; and, acquire equipment for pipe-laying, maintenance and repairs. The Bishkek Water Company, a municipal enterprise of the City of Bishkek. Up to EUR 5.4 million loan to the Bishkek Water Company with a sovereign guarantee of the Kyrgyz Republic. EUR 11.4 million. The project will improve water quality standards and energy efficiency in the water supply services provided by the Company. However, the funding under the current project will not allow the Client to achieve full compliance with EU water quality standards. Screening Category and Justification: Screened as B/1. Potential environmental impacts associated with the priority capital investments to improve the water quality, supply and energy efficiency of Bishkek water services were identified and quantified by means of an environmental analysis which was carried out together with environmental review/audit of existing facilities by an independent consultant. Due Diligence Undertaken, Outcomes and Residual Risks An environmental audit existing facilities and an environmental analysis of the proposed project has been carried out. Most impacts will be short-term negative impacts typical for any kind of civil construction and earthmoving works. These impacts could include minor traffic disturbances, pollution of air with dust and emissions from vehicles, soil run-off and sedimentation, noise, odour and light nuisance, additional waste generation. Other impacts on the environment, the human health and social conditions will work in the long-term prospect, during the operation and maintenance of the project affected facilities. These impacts can be mitigated or prevented by good construction practises which are identified in the ESAP. The project will improve water quality standards and energy efficiency in the water supply services provided by the Company. However, the funding under the current project will not allow the Client to achieve full compliance with EU water quality standards. Implementation Requirements As part of the due diligence, an Environmental and Social Action Plan (ESAP) has been prepared covering the required actions for issues related to the investment programme. The ESAP includes the organisational responsibilities for implementation of the ESAP and mitigation actions to be taken before and during construction, and operation. The ESAP has to be agreed with the Company prior to Board, and needs to be included in the legal agreements. Pre-signing Post-signing

Original sector

Municipal Infrastructure

Location

Country

Kyrgyzstan

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Residential, Automotive

Article published date

2025-07-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project