Bismark Drive & Christopher Drive Multi-Use Trail
Sector: Car parking • Location: Cambridge, Ontario, Canada
Source: Dodge USA
The work on both Bismark Drive and Christopher Drive includes the removal of existing concrete sidewalk and the construction of a new 3.0m wide asphalt multi-use trail in its place. Minor grading within the boulevard will be required as well as the supply and installation of topsoil and sod. New durable pavement markings will also be required and other miscellaneous works.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Start |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The work on both Bismark Drive and Christopher Drive includes the removal of existing concrete sidewalk and the construction of a new 3.0m wide asphalt multi-use trail in its place. Minor grading within the boulevard will be required as well as the supply and installation of topsoil and sod. New durable pavement markings will also be required and other miscellaneous works. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
