Bitdeer Cryptocurrency Warehouse - Office - Data Center
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
28 to 30 buildings at property along the west side of Ninth Street SW, between Industrial Avenue SW and Albrecht Street SW, - plans involve constructing two warehouses/office and 26 (40 ft x 110 ft) database buildings - 221MW datacenter
- Status
- Closed
- Sector
- Commercial, Data Center, Warehouse, Manufacturing (Industrial), Road, Residential, Cement
- Location
- Massillon, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Bitdeer Cryptocurrency Warehouse - Office - Data Center
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 28 to 30 buildings at property along the west side of Ninth Street SW, between Industrial Avenue SW and Albrecht Street SW, - plans involve constructing two warehouses/office and 26 (40 ft x 110 ft) database buildings - 221MW datacenter |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Massillon |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Data Center, Warehouse, Manufacturing (Industrial), Road, Residential, Cement |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
