logo
ProjectPlanned

Bitdeer's 101 MW Power Project

Sector: Power Generation (CCGT) • Location: Fox Creek, Alberta, Canada

Source: Stock Titan

Bitdeer Technologies Group has acquired a 101 MW site and gas-fired power project in Alberta for $21.7 million. This project aims to create the world's first fully-vertically integrated Bitcoin mining hub, with plans to scale power generation up to 1 GW and deploy advanced mining machines.

Status
Prospective
Sector
Power Generation (CCGT)
Location
Fox Creek, Alberta, Canada
Updated
22 Jul 2026
Source
Stock Titan

ConstructChat

Ask ConstructChat about Bitdeer's 101 MW Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bitdeer's 101 MW Power Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Fox Creek, Alberta, Canada. Taiyo aggregates data on it from Stock Titan.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Bitdeer Technologies Group has acquired a 101 MW site and gas-fired power project in Alberta for $21.7 million. This project aims to create the world's first fully-vertically integrated Bitcoin mining hub, with plans to scale power generation up to 1 GW and deploy advanced mining machines.

Original sector

Energy

Budget

Location

Country

Canada

State

Alberta

City

Fox Creek

Source

Source

Stock Titan

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2025-02-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project