Bitfarms Washington AI Infrastructure Conversion
Sector: Power Generation (CCGT) • Location: Washington, United States
Source: Yellow.com
Bitfarms is converting its 18-megawatt facility in Washington State into a liquid-cooled GPU facility to support Nvidia's GB300 graphics processors, part of the Vera Rubin generation expected to launch in late 2026. This project represents a shift from Bitcoin mining to AI infrastructure, featuring advanced cooling and power management systems. The conversion is targeted for completion as early as
- Status
- Under Construction
- Sector
- Power Generation (CCGT)
- Location
- Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Yellow.com
ConstructChat
Ask ConstructChat about Bitfarms Washington AI Infrastructure Conversion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Bitfarms is converting its 18-megawatt facility in Washington State into a liquid-cooled GPU facility to support Nvidia's GB300 graphics processors, part of the Vera Rubin generation expected to launch in late 2026. This project represents a shift from Bitcoin mining to AI infrastructure, featuring advanced cooling and power management systems. The conversion is targeted for completion as early as December 2026. |
Original sector | Technology |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
Source
Source | Yellow.com |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-11-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States
- EPC of Turbine and Foundation Structure in the Southwest Sea Wind Power Demonstration Complex
- Engineering, Procurement, and Construction of Third Bosphorus Bridge
- Tampa Bay Seawater Desalination Plant
- Carlsbad Desalination Project, San Diego, California
- Joint Base Lewis-McChord
- Fort Benning, Georgia
- Naval Base San Diego, California
- Dover Air Force Base
