Bitterroot Trail Lighting
Bid results · Montana · Last reported Dec 2024
Source: Dodge USA
The work generally includes the complete installation of a trail lighting system, and related work, in accordance with the Plans and Specifications. Contractor shall be required to coordinate all work with the City of Missoula and affected Utilities. The work for this project will be approved and inspected by the City of Missoula Department of Parks and Recreation. Engineering services to provide
- Status
- Closed
- Sector
- Government, Power Transmission, Commercial, Car parking, Power Generation (CCGT), Road, Automotive
- Location
- Missoula, Montana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Bitterroot Trail Lighting
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work generally includes the complete installation of a trail lighting system, and related work, in accordance with the Plans and Specifications. Contractor shall be required to coordinate all work with the City of Missoula and affected Utilities. The work for this project will be approved and inspected by the City of Missoula Department of Parks and Recreation. Engineering services to provide final design and engineering, bidding, construction management, and project close-out services fo... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Montana |
City | Missoula |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Power Transmission, Commercial, Car parking, Power Generation (CCGT), Road, Automotive |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- I-95 NB @ ST MARYS RIVER - BRIDGE REHAB
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- SR 2 FM SR 15 IN CLAYTON TO SOUTH CAROLINA STATE LINE
