Bituminous Overlay and Aggregate Shouldering
Sector: Government • Location: Glenwood, Minnesota, United States of America
Source: Dodge USA
Project Number: SAP 061-618-037 Location: Pope County CSAH 18 Type of Work: Bituminous Overlay and Aggregate Shouldering Length: 6.955 MilesThe major items of work are: Aggregate Surfacing, Class 1 3890 Tons Type SP 9.5 Wearing Course Mix (2,B) 38,430 Tons Milled Sinusoidal Rumble Strips Intermittent 50,630 LF Traffic Control 1 Lump Sum and other items.
- Status
- Closed
- Sector
- Government, Commercial, Manufacturing (Industrial)
- Location
- Glenwood, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Bituminous Overlay and Aggregate Shouldering
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project Number: SAP 061-618-037 Location: Pope County CSAH 18 Type of Work: Bituminous Overlay and Aggregate Shouldering Length: 6.955 MilesThe major items of work are: Aggregate Surfacing, Class 1 3890 Tons Type SP 9.5 Wearing Course Mix (2,B) 38,430 Tons Milled Sinusoidal Rumble Strips Intermittent 50,630 LF Traffic Control 1 Lump Sum and other items. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Glenwood |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
