logo
ProjectBidding

Bituminous Reconstruction Pth 11 In Powerview

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

SECTION I PTH 11 (Bituminous Reconstruction) (Project ID No. C07043) Construction of bituminous pavement, including granular base course, crushed rock, milling of existing bituminous pavement, waste excavation, common excavation, concrete curb & gutter, land drainage system, and culvert installations on Provincial Trunk Highway 11, from Provincial Road 304 to 1.7km west of Provincial Road 304, for

Status
Prospective
Sector
Cement, Road, Commercial, Manufacturing (Industrial), Waste Processing and Treatment
Location
Winnipeg, Manitoba, Canada
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Bituminous Reconstruction Pth 11 In Powerview

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Bituminous Reconstruction Pth 11 In Powerview” is an infrastructure initiative in the Cement sector, located in Winnipeg, Manitoba, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

SECTION I PTH 11 (Bituminous Reconstruction) (Project ID No. C07043) Construction of bituminous pavement, including granular base course, crushed rock, milling of existing bituminous pavement, waste excavation, common excavation, concrete curb & gutter, land drainage system, and culvert installations on Provincial Trunk Highway 11, from Provincial Road 304 to 1.7km west of Provincial Road 304, for a total construction distance of approximately 1.5km, in the Town of Powerview-Pine Falls. SECTI...

Procurement method

Budget

Location

Country

Canada

State

Manitoba

City

Winnipeg

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Cement, Road, Commercial, Manufacturing (Industrial), Waste Processing and Treatment

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project