Bituminous Surfacing
Closed · Minnesota · Last reported Aug 2024
Source: Dodge USA
Bituminous surfacing of Division St W. The work will consist of 1-2" base course SP 9.5 wear (2, B) base course 24' wide, 1-1 wear course SP 9.5 wear (2, B) wear course 24' wide with 2' bump out at all driveways and roads, and all striping. Shoulders shall be 2' Class 1 Gravel with tack coat on them. Tolerance Class 5 before paving, and test results per MN DOT specifications. The road is approxima
- Status
- Closed
- Sector
- Road, Government, Commercial, Manufacturing (Industrial)
- Location
- Bemidji, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Bituminous Surfacing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Bituminous surfacing of Division St W. The work will consist of 1-2" base course SP 9.5 wear (2, B) base course 24' wide, 1-1 wear course SP 9.5 wear (2, B) wear course 24' wide with 2' bump out at all driveways and roads, and all striping. Shoulders shall be 2' Class 1 Gravel with tack coat on them. Tolerance Class 5 before paving, and test results per MN DOT specifications. The road is approximately 1 mile long, the expected completion date on this project is September 30, 2024. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Bemidji |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
