logo
ProjectClosed

BJRUSS Phase I Construction Project

Sector: Water Supply and Storage • Location: Tallapalem, Andhra Pradesh, India

Source: India Investment Grid (IIG)

Information Water Resources Department, Govt. of A.P has come up with BJRUSS Phase I Construction Project with a ticket size of 2022.2 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project This project is contemplated to serve 8.00 Lakh AC of ayacut in

Status
Closed
Sector
Water Supply and Storage, Road, Government
Location
Tallapalem, Andhra Pradesh, India
Updated
22 Jul 2026
Source
India Investment Grid (IIG)

ConstructChat

Ask ConstructChat about BJRUSS Phase I Construction Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “BJRUSS Phase I Construction Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Tallapalem, Andhra Pradesh, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Participants

Sponsoring Agency

Company

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Information Water Resources Department, Govt. of A.P has come up with BJRUSS Phase I Construction Project with a ticket size of 2022.2 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project This project is contemplated to serve 8.00 Lakh AC of ayacut in the upland areas of the Uttarandhra districts i.e. Anakapalle, Visakhapatnam, Vizianagaram, Parvathipuram Manyam and Srikakulam by drawing 63.20 TMC of flood waters of River Godavari from Polavaram Irrigation Project Left Main Canal @ km 162.409. Administrative sanction was accorded for Phase-I works for Rs.2022.20 Cr with SSR 2016-17 vide GO Ms No:53 dt : 05.09.2017. Subsequently the estimate has been re-casted and cost of overall project was arrived at Rs.17411.40 Cr i.e., Phase-I :Rs.2022.20 Cr with SSR 2016-17 & Phase-II 15389.20 with SSR 2020-21. Phase-I comprises of 2 packages & Phase-II 6 packages, for which Cabinet approval accorded on 03.09.2020. Revised Administrative Approval was accorded for Rs.17050.20 Cr vide GO. Ms. No.40 dt.16.06.2022. Main components of the Proposal: a. Pedapudi Reservoir b. Gravity Canal. c. Jammadhulapalem Theeda pump houses d.Leading channel e. Canal distributaries 1R 2R as piped network ,3R,1L,HLC Open canal. Phase-I works are awarded to contracting agencies under two packages for Rs.907.52 Cr.

Original sector

Water Resources

Procurement method

Budget

Location

Country

India

State

Andhra Pradesh

City

Tallapalem

Source

Source

India Investment Grid (IIG)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Government

Article published date

2024-03-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project