logo

BJRUSS Phase I Construction Project

Sector: Water Supply and Storage • Location: Tallapalem, Andhra Pradesh, India

Source: India Investment Grid (IIG)

Project
Closed

Information Water Resources Department, Govt. of A.P has come up with BJRUSS Phase I Construction Project with a ticket size of 2022.2 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project This project is contemplated to serve 8.00 Lakh AC of ayacut in

Project Information FAQ

Project Information

5 Q
The project “BJRUSS Phase I Construction Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Tallapalem, Andhra Pradesh, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information Water Resources Department, Govt. of A.P has come up with BJRUSS Phase I Construction Project with a ticket size of 2022.2 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project This project is contemplated to serve 8.00 Lakh AC of ayacut in the upland areas of the Uttarandhra districts i.e. Anakapalle, Visakhapatnam, Vizianagaram, Parvathipuram Manyam and Srikakulam by drawing 63.20 TMC of flood waters of River Godavari from Polavaram Irrigation Project Left Main Canal @ km 162.409. Administrative sanction was accorded for Phase-I works for Rs.2022.20 Cr with SSR 2016-17 vide GO Ms No:53 dt : 05.09.2017. Subsequently the estimate has been re-casted and cost of overall project was arrived at Rs.17411.40 Cr i.e., Phase-I :Rs.2022.20 Cr with SSR 2016-17 & Phase-II 15389.20 with SSR 2020-21. Phase-I comprises of 2 packages & Phase-II 6 packages, for which Cabinet approval accorded on 03.09.2020. Revised Administrative Approval was accorded for Rs.17050.20 Cr vide GO. Ms. No.40 dt.16.06.2022. Main components of the Proposal: a. Pedapudi Reservoir b. Gravity Canal. c. Jammadhulapalem Theeda pump houses d.Leading channel e. Canal distributaries 1R 2R as piped network ,3R,1L,HLC Open canal. Phase-I works are awarded to contracting agencies under two packages for Rs.907.52 Cr.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data