BJRUSS Phase I Construction Project
Sector: Water Supply and Storage • Location: Tallapalem, Andhra Pradesh, India
Source: India Investment Grid (IIG)
Information Water Resources Department, Govt. of A.P has come up with BJRUSS Phase I Construction Project with a ticket size of 2022.2 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project This project is contemplated to serve 8.00 Lakh AC of ayacut in
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Government
- Location
- Tallapalem, Andhra Pradesh, India
- Updated
- 22 Jul 2026
- Source
- India Investment Grid (IIG)
ConstructChat
Ask ConstructChat about BJRUSS Phase I Construction Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Information Water Resources Department, Govt. of A.P has come up with BJRUSS Phase I Construction Project with a ticket size of 2022.2 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project This project is contemplated to serve 8.00 Lakh AC of ayacut in the upland areas of the Uttarandhra districts i.e. Anakapalle, Visakhapatnam, Vizianagaram, Parvathipuram Manyam and Srikakulam by drawing 63.20 TMC of flood waters of River Godavari from Polavaram Irrigation Project Left Main Canal @ km 162.409. Administrative sanction was accorded for Phase-I works for Rs.2022.20 Cr with SSR 2016-17 vide GO Ms No:53 dt : 05.09.2017. Subsequently the estimate has been re-casted and cost of overall project was arrived at Rs.17411.40 Cr i.e., Phase-I :Rs.2022.20 Cr with SSR 2016-17 & Phase-II 15389.20 with SSR 2020-21. Phase-I comprises of 2 packages & Phase-II 6 packages, for which Cabinet approval accorded on 03.09.2020. Revised Administrative Approval was accorded for Rs.17050.20 Cr vide GO. Ms. No.40 dt.16.06.2022. Main components of the Proposal: a. Pedapudi Reservoir b. Gravity Canal. c. Jammadhulapalem Theeda pump houses d.Leading channel e. Canal distributaries 1R 2R as piped network ,3R,1L,HLC Open canal. Phase-I works are awarded to contracting agencies under two packages for Rs.907.52 Cr. |
Original sector | Water Resources |
Procurement method | |
Budget |
Location
Country | India |
State | Andhra Pradesh |
City | Tallapalem |
Source
Source | India Investment Grid (IIG) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government |
Article published date | 2024-03-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in India
- Kiru Hydroelectric Project Jammu and Kashmir India
- Pinnapuram Integrated Renewable Energy Project India
- Chuzachen Hydroelectric Power Project Sikkim
- Mahan I Power Project Madhya Pradesh
- Rampur Hydro Electric Power Project Himachal Pradesh
- UriII Hydroelectric Project Jammu and Kashmir
- Kakrapar Atomic Power Station Expansion
- Nathpa Jhakri India Hydroelectric Power Plant
