logo
ProjectClosed

Black Canyon Switchyard and Service Upgrades

Sector: Power Generation (CCGT) • Location: Emmett, Idaho, United States of America

Source: Dodge USA

Work is located approximately 6 miles northeast of Emmett, Idaho, in Gem County. Principal components of work are: A. Remove station service panelboard DSA and replace with low voltage switchgear outside of the switchyard. B. Remove transformers K7, K8, K9 and consolidate loads to: 1. One 6.9kV to 480V, 3-phase, 750kVA outdoor, dry-type, medium voltage station service transformer (KSA). 2. Two 480

Status
Closed
Sector
Power Generation (CCGT), Commercial
Location
Emmett, Idaho, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Black Canyon Switchyard and Service Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Black Canyon Switchyard and Service Upgrades” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Emmett, Idaho, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Work is located approximately 6 miles northeast of Emmett, Idaho, in Gem County. Principal components of work are: A. Remove station service panelboard DSA and replace with low voltage switchgear outside of the switchyard. B. Remove transformers K7, K8, K9 and consolidate loads to: 1. One 6.9kV to 480V, 3-phase, 750kVA outdoor, dry-type, medium voltage station service transformer (KSA). 2. Two 480V to 120/240V, 3-phase, outdoor, dry-type, low voltage transformers, one 45kVA (KSD) and one 150k...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Idaho

City

Emmett

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial

Article published date

2024-04-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project