Black Hill Trail Improvements
Sector: Car parking • Location: St. George, Utah, United States of America
Source: Dodge USA
The project is located west of the Tech Ridge Development. Major components of the project are summarized below. Import material of approximately 1,315 cy 130 feet of various size Storm drainpipe. Interchange offramp from SH-16 to Aerie Way Roadway improvement for approximately 2,800 square feet of rock wall. 27,415 square feet of asphalt and road base. 1,410 linear feet of handrail.
- Status
- Closed
- Sector
- Car parking, Mass Transit, Rail, Government, Road, Automotive, Commercial
- Location
- St. George, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Black Hill Trail Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is located west of the Tech Ridge Development. Major components of the project are summarized below. Import material of approximately 1,315 cy 130 feet of various size Storm drainpipe. Interchange offramp from SH-16 to Aerie Way Roadway improvement for approximately 2,800 square feet of rock wall. 27,415 square feet of asphalt and road base. 1,410 linear feet of handrail. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | St. George |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Mass Transit, Rail, Government, Road, Automotive, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
