logo

Black Mountain Data Center

Sector: Power Generation (CCGT) • Location: Fort Worth, Texas, United States

Source: IndexBox

Project
Planned

A proposed data center development on a 187-acre site on the southeastern edge of Fort Worth, Texas. The plan includes four buildings with a maximum height of 70 feet, a 70-foot setback increase along Lon Stephenson Road, a dedicated Oncor electricity substation supplying power exclusively to the data center, 2.2 million square feet of enclosed space, and 246 parking spaces. The site is located at

Status
Prospective
Sector
Power Generation (CCGT), Car parking, Data Center, Automotive, Road
Location
Fort Worth, Texas, United States of America
Updated
22 Jul 2026
Source
IndexBox

ConstructChat

Ask ConstructChat about Black Mountain Data Center

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Black Mountain Data Center” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Fort Worth, Texas, United States. Taiyo aggregates data on it from IndexBox.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A proposed data center development on a 187-acre site on the southeastern edge of Fort Worth, Texas. The plan includes four buildings with a maximum height of 70 feet, a 70-foot setback increase along Lon Stephenson Road, a dedicated Oncor electricity substation supplying power exclusively to the data center, 2.2 million square feet of enclosed space, and 246 parking spaces. The site is located at the intersection of Lon Stephenson Road and Forest Hill Drive and was rezoned in 2025.

Original sector

Built Sector

Location

Country

United States of America (USA)

State

Texas

City

Fort Worth

Source

Source

IndexBox

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Car parking, Data Center, Automotive, Road

Article published date

2026-05-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project