Black Pine Gold Project Feasibility Drill Program
One of 10,000+ projects Taiyo tracks in Idaho.
Source: Lelezard
Ongoing approximately 40,000 metre feasibility drill program at the Black Pine Gold Project in southeastern Idaho to support resource conversion, metallurgical modelling, geotechnical studies, and mine design. The program includes drilling in the Discovery Zone and Rangefront zones to increase confidence in mineralization and metallurgical models, validate metallurgical models, and support updated
- Status
- Under Construction
- Sector
- Mining
- Location
- Idaho, United States of America
- Updated
- 22 Jul 2026
- Source
- Lelezard
ConstructChat
Ask ConstructChat about Black Pine Gold Project Feasibility Drill Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Ongoing approximately 40,000 metre feasibility drill program at the Black Pine Gold Project in southeastern Idaho to support resource conversion, metallurgical modelling, geotechnical studies, and mine design. The program includes drilling in the Discovery Zone and Rangefront zones to increase confidence in mineralization and metallurgical models, validate metallurgical models, and support updated feasibility resource modeling. |
Original sector | Mining |
Location
Country | United States of America (USA) |
State | Idaho |
Source
Source | Lelezard |
URL |
More Details
Record type | Project |
Article published date | 2025-11-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
